MK2 Resto Mod
So it all begins :) Car has been completely stripped, shotblasted and now the real fun commences!
Keep checking back here for more updates.
The Monster to run the beast
Engine being delivered ready for strip down
(IRS) Independent Rear suspension mock up ready for dry fitting - all our mechanical work carried out by Paul and Ryan at Hawkesbury Classic and Performance.
Sunday Fun Day
Sundays a fun day for us. Engine and box is in position ready for Lee to work his magic, the rear i.r.s is also in position now, ready for the new chassis mounting points to be welded in place. So far so good 👌
Another Sunday Hard At it :)
Sunday fun - rear axle has been pre-fitted, engine has been temporary fitted, front suspension/cross member pre-fitted and TWR wheels (225/65 R15 on the fronts and 295/50 R15 on the rear) dummy fit to gauge rough measurements of what wheels and tyre's are available for the look and stance.
Box section stands under wheels are temporary due to no suspension lol
Big shout out to Paul and Ryan @ Hawkesbury Classic and Performance for helping with the mechanical work 👍😁So far so good 👌
New Brakes :)
Performance brake kit fitted to the rear I.r.s , absoluptly stunning kit. These should provide enough stopping power, 325mm x 30mm. 4 pot calipers.
Trial Fitment day
Setting the ride height so the driveshaft's can be chopped and used as patterns. So far everything is looking good front subframe to customise next to enable them to mount some adjustable shock absorbers. Once this is done we can order his wheels to suit, and continue with his custom body design!